Feature Requests & Ideas

For bug reports and questions, please use the in-app chat or support@mabl.com.

Allow running different stages of test plan in parrallel

As a tester I would like to be able to have the option of running multiple stages of a test plan in parallel.

We have found that in a test plan, one can have multiple stages and in each stage, one can override the device settings. So we decided to include both desktop and mobile tests into 1 plan, separating them with stages. But we discovered that the test plan stages were running sequentially, which defeats the purpose of collecting all the tests into 1 plan.

  • Jason Carty
  • Jun 28 2021
  • For Consideration
  • Attach files
Copyright © 2021 mabl Inc. All rights reserved.