Feature Requests & Ideas

For bug reports and questions, please use the in-app chat or support@mabl.com.

Allow stages or individual tests to use different devices during a plan run

As a tester I would like to be able to set each stage of my test to run with a different device. For example, I would like the stages 1, 3 and 5 to all run on desktop while stages 2 and 4 run on mobile.

or

It seems intuitive to me to not set the default of the Test Plan and instead let each test run off the setting for that test. So if I had a plan with 5 tests in parallel, each test would run off of the default device settings for that test rather than being overridden by the plan setting.

  • Jay Trommer
  • Apr 13 2022
  • For Consideration
  • Attach files
Copyright © 2021 mabl Inc. All rights reserved.